Second Wind Air PurifiersInstallation Manual24142414-S24 VoltRemote Units
All Second Wind air purifiers are designed to address Heat-ing and Air Conditioning air handling units. Second Windair purifiers use ultraviolet germi
1.Install the lamp where you have easy access.2.Make sure before drilling into equipment that there is nothing in the way that would be damaged.3.The
•The installation should be done by a qualifiedHVAC contractor. Unit must be installed in com-pliance with all national and local electrical andmechan
The Second Wind Ultraviolet Germicidal Photo-catalytic 24 Volt Lamp is designed for 9000-11,000 hours of con-tinuous operation. After 9000 hours inten
If the unit does not work, check the following:Electrical Supply/Wiring—Verify that the electricalservice is operating correctly.Ballast—If lamp still
WARRANTY LIMITATIONSThis warranty will be voided if the covered equipment (only Second Wind replacementparts or units are warranted) is removed from t
24 voltPowerWhite wire–24 VAC RedBlack Wire–24 VAC Black
Commentaires sur ces manuels