Second Wind 9000 Manuel d'installation

Naviguer en ligne ou télécharger Manuel d'installation pour Filtres à air Second Wind 9000. Second Wind 9000 Installation manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Second Wind Air Purifiers
Installation Manual
2414
2414
-
S
24 Volt
Remote Units
Vue de la page 0
1 2 3 4 5 6 7 8

Résumé du contenu

Page 1

Second Wind Air PurifiersInstallation Manual24142414-S24 VoltRemote Units

Page 2

All Second Wind air purifiers are designed to address Heat-ing and Air Conditioning air handling units. Second Windair purifiers use ultraviolet germi

Page 3

1.Install the lamp where you have easy access.2.Make sure before drilling into equipment that there is nothing in the way that would be damaged.3.The

Page 4

•The installation should be done by a qualifiedHVAC contractor. Unit must be installed in com-pliance with all national and local electrical andmechan

Page 5

The Second Wind Ultraviolet Germicidal Photo-catalytic 24 Volt Lamp is designed for 9000-11,000 hours of con-tinuous operation. After 9000 hours inten

Page 6

If the unit does not work, check the following:Electrical Supply/Wiring—Verify that the electricalservice is operating correctly.Ballast—If lamp still

Page 7

WARRANTY LIMITATIONSThis warranty will be voided if the covered equipment (only Second Wind replacementparts or units are warranted) is removed from t

Page 8

24 voltPowerWhite wire–24 VAC RedBlack Wire–24 VAC Black

Commentaires sur ces manuels

Pas de commentaire